| With the development of economic,construction enterprises in Weifang emerge in endlessly.Facing increasingly severe market competition,strengthening advantages of construction enterprises,meticulous management of labor management become inevitable.It is a trend of Weifang construction industry’s reform and development to strengthen the construction of the operating layer and to implement the separation of two layers.Construction Project labor management has become a major topic of project management. It is the key to the success of the project. It requires the labor management work to be more standardized and scientific with the development of computer technology and the construction of enterprise information that building construction project and labor service management system seems to be inevitable. Fast, accurate and comprehensive collection of information can be realized if the information management of construction project labor service is settled up.The system avoids the block of the information channel and enhances the analysis and summary of the information.It can store and handle accumulated raw data efficiently.The system plays a crucial role in strengthening the management of the labor and employment acts of Weifang construction project, standardizing the construction projects labor service contractors and owners’behaviors,maintaining the legitimate rights and interests of the construction industry workers and promoting the healthy development of the construction industry labor market.This paper describes the design and implementation process of the of Weifang construction projects and labor service management system.Firstly,the paper introduces the development background of the system and analyzes the research situation at home and abroad which concludes the necessity and practical significance of the system development.Detailed requirements elicitation and requirements analysis are made for Weifang construction projects and labor service management which are the basis for the functional design of the system.System uses a Struts2.0of+Spring+Hibernate development framework and designs B/S structure management system.The system is designed by the current’s mainstream software,Model-View-Controller.Using SQL Server2005to store and manage the data.Finally the paper describes the specific implementation of the system and demonstrates functional interface and code of the system.Weifang construction projects and labor service management system are realized ultimately.Five functions come into being in the system:enterprise information management, project’s basic information management, project’s personnel information management, project’s information review report and personal inquiry, as well as reporting.In order to facilitate the use of the system and finish various managements and business more efficiently,the system also provides auxiliary functionality, the report of the project reminding information, completion of the project and project query are included.The management system can greatly increase enterprise’s information storage and analysis capabilities towards projects, business and personnel which improve the management efficiency of construction projects and labor service system in Weifang. |