| By analyzing the processes of the hydropower stations’ power generation, as wellas by combining the centralized control management techniques, the paper putsforwards an useful quality management method for the power generation, which iscalled the integrated quality management.This management method is base on the theories of TQM, and regards thecomputer technology as the resort. With the core concepts,including the management ofgenerating process, the field management, the quality information management, thequality costs management and the evaluation management of generating status, thepaper combines the theory of TQM tightly with the management methods used in thecurrent power generation in centralized control hydropower stations to hoping to changethe work opinions that only pursuing the planed objections of safety and thecommands executivating exited in most currently power stations. With the qualitymanagement methods, the power generating enterprises will pay much more attention tothe quality costs and the power product’s competitive ability in the forthcomingmarketization.The contents and research conclusions is as follows:①Based on the module of centralized control management, the paper putsforward the connotation of integrated quality management fits on the hydropowerstations;②With the theories of the TQM and the continue improvement, the paper designsa system for the integrated quality management. This system improves the process ofdate management, the document management, the operation, and maintenancemanagement. What ‘s more, the paper puts forward the process of quality management.③The paper improves the application of the technologies of TVM, and the TPM,and the evaluation. In the improvement of evaluation, the paper optimized the indexes’computing methods on safety assessment and economical assessment;④In the assessment of safety, the paper puts forward the indexes called safetydegree of equipment’s fault treatment and the safety factor firstly. And in the assessmentof economical efficiency, the paper puts forward the indexes called the value-addedfactor of power generating capacity and the ratio between the reservation and theconsummation in spare parts; Through the studying of the integrated quality management on centralized controlhydropower stations, the paper hoping to offer the power generation some helps to adaptthe markets, and makes some contributions to the development of productionmanagement on hydropower stations. |