| With continued economic growth in Yangjiang, the community reliability requirementsalso will continue to enhance and improve the power supply bureau of Yangjiang Citydistribution network fault repair, rapid restoration to improve power supply reliability ratelevels are an important way. Although in recent years on the power supply bureau ofYangjiang distribution network fault repair work processes and methods for research andexploration, but because of my bureau computer networks and management informationsystem development immature technology and other reasons, has not yet formed a clear rapidrestoration system construction plan and specific implementation steps, can not really buildfast restoration information systems, to Yangjiang distribution network fault repair work isseverely affected.This topic Yangjiang distribution network based on fault repair work to the actual needs,focus on the rapid restoration system requirements analysis, system architecture, technologyroadmap and system design and implementation, rapid re-power distribution networkinformation system is targeted at rapid restoration integrated software system working. Rapidrestoration systems used in the technical architecture of advanced J2EE technology, thesystem uses C/S architecture, database selection of international popular Oracle database andthe application of SOA-based data server, and then completed a rapid recovery of YangjiangCity Power Supply Bureau electrical system design and development. Rapid restorationsystem consists of power monitoring center, fault repair management, multi-screen commandand management, customer support, customer protection management, field work terminals,repair resource management, assessment and supervision modules. Meanwhile, the subjectachieved in rapid restoration systems and distribution network data interface between theproduction system to achieve repair data sharing. In addition, the system for the rapidrestoration outreach network channel choices for the design and safety analysis, by studyingcontrast, chose to implement the access area on the NAT firewall, thus achieving internal andexternal network connectivity, making the PDA data safe and timely, stability back to thesystem server.Through rapid construction of complex electrical systems to achieve a distributionnetwork for the operation of Yangjiang, fault conditions, power outages affected area, faulthandling a full range of management to improve the distribution network to monitor the levelof repair work, so that distribution network faults can achieve rapid detection, rapid positioning, quick fixes, power outage information promptly inform customers. Rapidimplementation of complex electrical systems for power distribution network of enterprisesfast fault repair power grab work management provides a more convenient and efficient wayfor the future supply enterprise information construction is irreplaceable application value andpractical significance. |