Font Size: a A A

The Improvement Of The Electric Power Construction Engineering Contracting Mode In The Contract

Posted on:2014-08-17Degree:MasterType:Thesis
Country:ChinaCandidate:J QinFull Text:PDF
GTID:2256330422954482Subject:Law
Abstract/Summary:PDF Full Text Request
Due to the particularity of electric power industry system and somecharacteristics of the electric power construction project itself, electric powerconstruction project contract mode is messy and complicated. Variouscontracting mode in electric power construction engineering market, amongthem there are violations, and even illegal phenomenon. In recent years as thecompletion of the power system reform, contradictions in the electric powerconstruction project contract mode has grown, subcontracting, specification ofthe subcontract and the affiliated contractor has to electric power constructionengineering market brings great management problems and quality safetyhidden trouble.The purpose of this paper is to through the analysis of the existing contractof the electric power industry and combine the characteristics of the structure ofelectric power industry system, introducing professional subcontracting andsubcontracting mode to solve problems in electric power constructionengineering contracting mode.
Keywords/Search Tags:Electric power construction engineering contract, subcontract, Professional subcontractor, labor subcontracting
PDF Full Text Request
Related items