Font Size: a A A

Room Renovation Project Scheme Of Qinhuangdao Port Overturned

Posted on:2014-06-25Degree:MasterType:Thesis
Country:ChinaCandidate:S S LiuFull Text:PDF
GTID:2262330392964177Subject:Project management
Abstract/Summary:PDF Full Text Request
Our country now is in the new sustainable and rapid development period,communicates with other areas and abroad more frequently, so the requirement of portproduction and logistic raises up, different industries in port get good opportunity fordevelopment. Port loading and discharging equipment is the key to ensure the production,loading and discharging and transportation in port, the efficiency of loading anddischarging equipment is the direct embodiment of port throughput. Port output efficiencyeffects the production and life in society directly in fierce port competition. Therefore, tocarry out effective innovation of car dumper room in port, is the key to develop portproduction and transportation efficiency. Innovating in car dumper room with the currentequipment and to formulating the best improvement plan is the kernel of this paper.The paper focus on study of car dumper room in Phase4Coal Terminal Project ofQinhuangdao Port, researches the macro-environment, reality and internal conditions ofQinHuangdao Port, analyses the instructive conditions and necessity of innovating cardumper room in different point of view, dissects the existed problem, possible innovationand expected efficiency in innovated process, and innovates the car dumper room based onthe case analyze and basic theoretic research, to develop the port loading and dischargingand throughput efficiency. At last it evaluates the expected efficiency in car dumper roominnovation and put forward the proposal based on the reality of loading and discharging inQinhuangdao Port.
Keywords/Search Tags:car dumper, loading and discharging, production, innovation, qinhuangdaoport
PDF Full Text Request
Related items