Font Size: a A A

Construction Project Case Study

Posted on:2013-05-30Degree:MasterType:Thesis
Country:ChinaCandidate:J J LiuFull Text:PDF
GTID:2266330422965417Subject:Law
Abstract/Summary:PDF Full Text Request
In recent years, along with our country economy rapid development of thesociety, the construction industry has become our country national economy theimportant one of the pillar industries, accompanied by the development of thereal estate industry expands, the corresponding construction contract disputealso increases ceaselessly subsequently. After the statistics, Ningboarbitration committee in the past10years in the case, the contract ofconstruction project construction accounted for the majority of. Due to theconstruction project dispute cases perplexing, professional and strong,involve an area wide, so the construction of engineering cases have becomearbitration cases in difficult cases. This article through to the constructioncontract in the common pieces of content, namely the construction contracteffect and processing, and contract processing, and the engineering settlementthree pieces of content, in order to have treated the case as the basis,empirical research.The full text is divided into four parts, mainly discusses the content asfollows:The first chapter introduces the invalid construction engineering contractsituation and relevant enlightenment, specifically in the form of casediscussed by confirmation of invalid construction contract processing.The second chapter introduces the concept of yin and Yang, and to the "Supreme People’s Court on construction contract dispute case applicable lawthe explanation of " twenty-first as the center, to the effectiveness of thecontract of yin and Yang, and to the Ningbo arbitration commission handlingcases as an example. In the third chapter, the arbitrators and arbitration the angle, theengineering settlement problem discussion on " undertake combing, the SupremePeople’s Court on construction contract dispute case applicable law theexplanation of " Twentieth comprehension questions are discussed, withemphasis on forensic engineering problems in analysis.The fourth chapter discusses the main work of this paper and innovation aswell as the paper shortage.
Keywords/Search Tags:The invalid construction contract, contract of yin and Yang, the engineering settlement
PDF Full Text Request
Related items