| Along with the telecommunication industry informatization degree is more and moredeep, do a lot of work China Telecom informatization construction of Zhejiang Province branch in mobile network construction projects. From the base station construction process to strictly high quality base station management are theimp-ortance and great investment China Telecom Zhejiang province branch. Mobileconstruction system and efficient support of the Zhejiang Telecom base stationmanagement.This paper describes the important work of Zhejiang Telecom mobile network construction projects throughout the life cycle of software engineering. Firstly, the system demand analysis elaborated Zhejiang telecom business demands for mobileconstruction system, this part mainly introduces the construction process and base station management functional requirements, and finally describes thesystem non functional requirements. Secondly, the general design of the systempresents the design principle, function structure design, technical architecture of the system; the design principle of the system is the content of the guidelines forthe construction of Zhejiang Telecom mobile system, guidance system architects to the overall system design aspects; functional structure design content, system architects were analyzed and optimized system the results of system function; and in the technical architecture design part of the system architecture, systemsecurity, network security, application system design in detail, which is the priority among priorities of the whole system. Again through the detailed design of the system about the technique routine of the system, system design, system database design. Finally, realization and system test part shows some functions of the system implementation and interface diagram and system testing process and results to everyone. Zhejiang Telecom mobile construction system is a pure java language development,using standard J2EE Struts+Sping+Hibernate framework is popular, referred to asSSH framework. The SSH framework is currently very popular open sourceframework of web application development. In general the integrated frame-work of the system SSH is divided into three layers:presentation layer, business logic layer,data persistence layer. The frame structure is clear, good reusability, maintenanceis very convenient. The system also integrates with JBPM open source software as a workflow engine system to support the base flow management, the JBPM engineprocess design flexible, simple development. Application server products used in the system for the Redhat production of JBOSS open-source software, database management software is the use of a higher market share of Oracle database. Non functional requirements and the system also introdu-ces load balance, dual hot backup, disk array, the cache technology or product to realize the system, solve the access pressure.The core module of Zhejiang Telecom mobile construction system is the base station construction process and base station management module. Theconstruction process includes the basic flow, site changes, the base station design change process and in the base station management module which is on the base station construction in the whole life cycle management mainly includes:the base stations, base station planning, design, the design of the station signeddistribution, design, design review, review, completion of base station opened,single station optimization of base stations, base station inspection, final inspection, a total of12base station archiving function. Zhejiang Telecom mobileconstruction system effectively support the construction of Zhejiang Telecommobile base station management process. The flow of information systemmanagement mode, the system provides Zhejiang Telecom mobile network base station construction efficiency, red-uce the cost of construction, the constructionquality control than before has greatly improved. |