Font Size: a A A

The Feasibility Study Report Of Shenzhen LC Electronics Co.Ltd. Suining Investment Projects

Posted on:2015-07-23Degree:MasterType:Thesis
Country:ChinaCandidate:X Y TianFull Text:PDF
GTID:2309330431968420Subject:Business administration
Abstract/Summary:PDF Full Text Request
The human society is in a highly developed information age, the rapiddevelopment of electronic information industry, become the country competing to grabinvestment and economic growth.As the semiconductor is an important part ofelectronic products, maintained a relatively strong market demand.The main globalsemiconductor manufacturers are in foreign countries, the semiconductor in Chinamainly rely on imports.As a less developed western region of Suining City, has been thedevelopment of the electronic industry as the adjustment of economic structure, animportant measure to promote industrial restructuring and upgrading, the initiative toundertake the eastern and coastal industrial transfer.Shenzhen LC company is engaged in special semiconductor products R&D andproduction since its inception, the strength, advanced technology, strict management. Atthe end of2010the company, registered capital of79000000yuan in Suining, set upSichuan LC Electronic Technology Co., Ltd., the production line construction twoelectronic products, formed an annual output of LED12million, diode, triode6000000000production capacity of12000000000. In order to develop withcharacteristics of the semiconductor market, the company from a strategic point of view,on the basis of the existing investment decision to build14inch3um and a6inch0.8um special discrete semiconductor and integrated circuit chip production line.Because of project investment, a longer cycle, we must conduct a comprehensiveassessment.The basic theory of investment project feasibility study from this, a comprehensiveanalysis of the financial, efficiency, technical feasibility of the project, the conclusion ofthe project feasible research. Firstly, introduces the contents and methods of research, significance, a brief analysis of the project background, general situation and marketenvironment and other factors; and then, around the two core contents of financing andeconomic benefits, in-depth analysis is given; finally, project management andconstruction scheme is proposed, the possible risks and risk avoidance measures.
Keywords/Search Tags:Shenzhen LC Electronics Inc, semiconductor, investment projectin Suining, fesibility
PDF Full Text Request
Related items