Font Size: a A A

Cost Management Communication Project Construction

Posted on:2016-05-09Degree:MasterType:Thesis
Country:ChinaCandidate:T WangFull Text:PDF
GTID:2309330479997697Subject:Project management
Abstract/Summary:PDF Full Text Request
Communications construction companies have long profit is not high, moreover its project construction period is longer, high investment, more individual projects, leading to the construction cost management is likely to occur in waste, it is necessary to strengthen the cost management and control, and in order to achieve this goal, it must be implemented in the pre-engineering to make a serious analysis, a comprehensive analysis of the difficulties encountered by the project progress and causes, in order to reduce losses.It also embarked on the basic concepts of project cost management, the integration of content and control of construction cost management measures to address the enterprise in project management in practical problem of high costs, a detailed description of the author of the project team of ×× mobile 4G network projects The construction process, the construction cost is determined based on the pre-budget cost targets, target cost to make a serious analysis of the cost of the project according to the project site and calculates the deviation of the actual cost and budget costs, the timely adoption of the relevant measures to deal with and correct, according to the construction process a variety of approaches related to the actual cost of data management, contact management and human resources cost schedule cost management and strive to achieve pre-determined implementation of the project cost control objectives.
Keywords/Search Tags:Cost management, Cost control, target management, Cost accounting, Budget cost
PDF Full Text Request
Related items