Font Size: a A A

Research On The Cost Management Of XX Service Enterprises

Posted on:2017-04-12Degree:MasterType:Thesis
Country:ChinaCandidate:Y L LiuFull Text:PDF
GTID:2309330503970005Subject:Project management
Abstract/Summary:PDF Full Text Request
Lots of factors provide strong space for the development of construction market such as the rapid development of market economy, the implementation of national relevant strategy, and speed up the urbanization process and so on. The prosperity and development of the construction industry provides a very important place for the labor transfer, the subcontracting market develop also at the time. This paper is mean to research the management and cost of services subcontractor, explore practical construction management and cost control method based on the main research point, establish the cost management system in accordance with the enterprise.First of all, according to the current situation of the cost management of labor subcontracting market, we find that there are some urgent problems to be solved in the market of labor subcontracting enterprises. Then, according to the specific circumstances of the enterprise, it is proposed to establish a cost management system, which includes three aspects: cost prediction, contract management and cost control. Then, in terms of cost planning, the factors that affect the accuracy of the cost prediction are analyzed by 5M1E’s analysis method, determine the impact of labor subcontracting cost control of the 12 factors, at the same time using the principal component analysis, The core influencing factors are locked in the contract signing and contract, labor service price and quantity change, labor service personnel’s ability to work and safety production, material equipment and equipment supply and storage of four aspects, and according to these influence factors, put forward the suggestion measure. Finally, in the "cost control", the study of cost control will be distributed to the three stages of pre-, post- and ex post, using earned value method to compare and analyze the project cost and the actual cost difference in the construction process, with the service enterprise is a commercial and residential building electrical installation professional services sub package as a case, after obtaining the specific data, the reasons for the formation of the differences are studied and the control methods are put forward according to the specific problems, Establish a cost management system which is fit for the specific situation of the labor service enterprise. I hope the research results of this paper can provide some guidance and reference for the maximum control costs of the service providers.
Keywords/Search Tags:Labor subcontracting, Sub contract cost, Cost planning, Cost control, Cost management
PDF Full Text Request
Related items