Font Size: a A A

Feasibility Study On Production And Processing Of 10,000 Tons Of Fermented Goat Milk Project

Posted on:2018-01-16Degree:MasterType:Thesis
Country:ChinaCandidate:Y G CaoFull Text:PDF
GTID:2321330542479383Subject:Light industrial technology and engineering
Abstract/Summary:PDF Full Text Request
At present,in the national economy of our country,the food industry has become the largest industry.However,with the rapid development of the food industry,the incidence of domestic food safety accidents is also on the rise.In particular,the "Sanlu poisoning milk powder" vicious incident in 2008 has even shocked the whole country.This food crisis has aroused the people in the world dairy industry in China,as well as the entire industry in China's food industry,"credit crisis",especially dairy products industry,the state implemented a market access system for dairy production enterprises,dairy products processing industry Proposed a higher development requirements.After investigation,we found that the consumption boom of sheep milk products has risen in both domestic and overseas markets in recent years,and the consumption demand for sheep milk products is getting higher and higher.The domestic dairy goat resources are relatively scarce,goat milk processing products is still in the primary stage of development,sheep milk products have not yet formed a complete industrial chain.The project construction unit keenly discovered this market opportunity and put forward the proposal of building "annual output of 10,000 tons of yogurt project" aimed at the serious shortage of milk and milk in our country.Starting from the abundant resources of goat milk in the EU,Standard strict requirements,starting from the milk quality assurance system,for the low thermal stability of goat milk,the application of the current world-class processing technology,to provide people with balanced nutrition,quality,safety and health of goat milk deep-processed products.The construction of this project is of great significance.First of all,the construction of the project is conducive to changing the current situation of local sheep milk processing industry and leading the local dairy goat industry to grow and develop.Secondly,the project construction is conducive to improving the physical fitness of our people.Thirdly,Increase the income of peasants and the transfer of local labor force;fourthly,the construction of the project is conducive to driving the development of the first and the third industries;finally,the project construction is the need of the construction unit for its own development and the inevitable choice for the development of the dairy industry.The proposed project address is located in Fengguo Road,Yishui County,Linyi City,Shandong Province.The project covers a total area of 16,415 square meters with a total construction area of 8,350 square meters.The project construction period is expected to be 3 months.After the project is completed,the main energy consumed For electricity,steam and water,the project purchases 80 sets of major production equipment,the project is completed,the production and processing of 1 million tons of goat milk.The total investment 86 million yuan,the project put into operation,the average annual operating income of 120 million yuan,total profit 28.4551 million yuan.The internal rate of return before and after tax was 39.39% and 30.23% respectively.The payback period after income tax was 4.49 years(including the construction period).After the project's net present value income tax of financial investment was 69.8384 million yuan(IC = 12%),the investment Profit margin is 33.09%.Starting from the background of the project construction,the thesis analyzes the background and significance of the project construction.Secondly,it introduces the theoretical foundation and current situation of the feasibility study.Then it introduces the general situation of the project and designs and introduces the civil engineering and auxiliary engineering.Environmental protection and energy saving were carried out feasibility analysis,and then elaborated the yogurt production technology process and process design,from the technical level to give the project a strong support for the feasibility.Finally,it provides strong data support for project feasibility study through financial analysis,including cost analysis,income analysis,analysis of important financial indicators plus some statistical methods such as sensitivity analysis,and carries out social and economic benefits of the project Analysis,to be assisted,and finally concluded that the project is feasible and made a series of recommendations.
Keywords/Search Tags:fermented goat milk, financial analysis, feasibility study
PDF Full Text Request
Related items