Design Management Research Of A Thermal Power Plant Construction Project

Posted on:2017-08-18Degree:MasterType:Thesis
Country:ChinaCandidate:J L RenFull Text:PDF
GTID:2322330512456444Subject:Engineering
Abstract/Summary:PDF Full Text Request
After capacity of thermal power plant become larger, and system more complicated, the design and construction process seriously come apart. It is a huge waste on human resource,material and finance. The passage is based on research and analysis according to the series of problems, and propose the suggestion of auxiliary method of IT software, at meanwhile establish a complete management system, including schedule management, informatization management, service on site management, monthly report and project cost management.etc.by comprehensive management method of various aspects.Theoretical basis is constructed on Michael Hammer. Royer compiled <BUSINESS PROCESS RE-ENGINEERING> and <Beyond Reengineering>. According to author’s project practice, deeper the theoretical development, and provide a moderate design management concept, and raise the specific problems of A thermal power plant, then analysis, finally support the corresponding solution.At first, passage raises some main specific problems in thermal power plant design technological process: such as design human resource is poorly stable, backward design method, without integration of automatic software, schedule management is not coordinate to construction schedule, input data management chaos and not timely feedback from site.The factors above restrict design management operating well and sequence, further more affect the whole project schedule.Then, according to essential analysis on problem above, from traditional function management transmit to modern design management. Base on requirement analysis of owner,and provide process optimizing measure, including: mode of individual department working,enhance communication between departments, decrease times of working handover,recognize no-value process and quality control.etc of measures. And aim at the specific problems of A thermal power plant, such as hardly lateral communication, complex serial working connection, crudely process management, poorly communication among departments etc., the effective measures will be taken according to detail analysis.Then passage from the view of A thermal power plant, making case analysis: first,structure project team, and optimized human resource, it should be harmonic with the construction group, stable design team and enhance team cohesion. Second, the project willapply schedule plan and millstone program, according to software of PROJECT and C3 P,that establish the schedule program of preliminary and construction design, make time schedule reasonable, and adjust dynamic management program. Third, the project will establish the informatization system, from the beginning of design input, including found files of internal and external data by different department, specification complied and drawing published, as per method of time restricted manage the schedule of project that could keep the files complete and effective and avoid wasting human resource to emerge faults. Forth, management system establishing, it is necessary to fulfill own task by individual department, control points of the process of design, and make each department realize the own roles and work in the design process, essentially, guarantee fluently communication among department. Fifth, service system establish at site, team at site should feedback problem occurred at site effectively and rapidly to design team, at meanwhile,explain the solution to construction group that build unblocked passage between design team and construction group. Sixth, system of monthly report establishing, design team and owner should be fully communications that make both realize the dynamic information about progress of project, scheme changed, progress adjustment and cost varied, which could reach owner’s participation. Seventh, strictly control cost, according to worth to win curve, that could control each part of thermal power plant, meanwhile, resolve and optimize the cost limited design, ensure to control project cost during construction period.Last, passage look forward to future design management, and pointed the direction of development of integral of design management, construction organization and operating management into project construction management system, make the whole design management more meticulous, and instructing practice, finally provide proper service to power plant owner and investor.
Keywords/Search Tags:Thermal power plant, Design management, Process, Software informationzation, Management system
PDF Full Text Request
Related items