Research On The Quality Control Of The Construction Project Of Jiangcheng Road In Yichang City

Posted on:2017-09-11Degree:MasterType:Thesis
Country:ChinaCandidate:L C BingFull Text:PDF
GTID:2322330518470502Subject:Engineering
Abstract/Summary:PDF Full Text Request
Jiang avenue project is the "five longitudinal and cross tenl" in yichang. the construction of the project implementation for Yichang will perfecting the urban functions, and speed up the development and construction of Yichang to realize "much starker choices-and graver consequences-in planning the identified target urban construction has the vital significance.Project for the construction of the high attention by local government and the social from all walks of life, the quality of project construction put forward higher requirements. Based on the overall management level of the highway engineering construction projects in China is still relatively low status, to ensure project completed by the high quality construction,requires all kinds of quality risks of project potential scientific and comprehensive analysis and evaluation, formulate the corresponding control measures, so as to ensure the quality of the project the desired level.Paper starting from the actual environment of river road project construction, the project at the early stage of the project quality control work of the overall deployment are analyzed,and put forward the project on the main problems of quality risk management. And then to solve these problems, jiang road project risk evaluation system is constructed. To the project quality of personnel, materials, equipment, technology, environment and so on various major potential quality risk factors in the effective identification and analysis, and on the basis of the results to build project risk evaluation index system, using the theory of analytic hierarchy process (ahp) and the matter-element extension of overall project quality risk and all kinds of main quality has carried on the quantitative analysis of risk factors, risk grade, determine the project quality risk factor levels, clear project overall risk level, lay the foundation for the project quality risk prevention and control work.To effectively reduce the project construction of the occurrence of all kinds of quality risks, the paper according to the project quality risk assessment results, formulate the specific measures of prevention and control of project quality risk, specific from personnel, materials,equipment, technology, environment, etc, to establish the specific countermeasures of reducing the risk of project quality, improve the ability to resist risk of the project, in order to ensure the smooth realization of the goal each construction. Thesis research can help project managers effectively improve the quality of project risk management theory basis and the technical level, to ensure the project smoothly. At the same time, summarizes the highway engineering project quality control in the actual operation experience for the similar project to provide technical information and practical reference.
Keywords/Search Tags:Road engineering, The quality of risk, Risk identification, Risk assessment, Risk control
PDF Full Text Request
Related items