A Investment Company Project Investment Cost Control Research

Posted on:2018-02-26Degree:MasterType:Thesis
Country:ChinaCandidate:Y LuoFull Text:PDF
GTID:2322330542971003Subject:Project management
Abstract/Summary:PDF Full Text Request
The characteristics of earthwork for A company of earthwork project cost control,the effect of earth cost factors to analyze and establish the system of cost control,and to take effective measures to control the cost.The purpose is to avoid the risk of cost overruns and resulting in a series of economic loss,ensure that the A project in the expected.The earthwork is one of the most important engineering construction,In this paper,the main contents of the study include several aspects:(1)site formation;(2)excavation artificial chisel;(3)stone blasting;(4)backfill;(5)earth transport and other projects,according to the different construction methods,It is divided into two types: the first is artificial earth and stone side,the second is the mechanical earth and stone side.This kind of project in great quantities,the process is also very much,and accordingly also involves many costs,so the cost control of complex tasks,one is likely to cost budget for the whole project cost control have a negative impact,and may even lead to the total cost of the project budget,which will the company benefit is greatly reduced.The earthwork project investment of A company cost control in the construction process to figure out the cost control,and combined with the characteristics of the project and the total cost budget and strictly control the cost of expenditure,in order to avoid because of the construction cost budget makes investment units caused economic losses.In the earthwork project budget,was determined by the following materials: 1)to determine the soil and rock type;2)to determine the location of the water level in the ground and drainage(precipitation)required by that method;3)to determine the earthwork,trench and foundation pit excavation(fill)to play the standard to be used only the construction method and it needs Of the distance;4)rock drilling,blasting method,how to determine the slag removal and transportation distance;5)and other relevant data.
Keywords/Search Tags:Earthwork, cost control, earthwork balance, vertical planning, site elevation and leveling
PDF Full Text Request
Related items