Font Size: a A A

The Study On Legal Question Of Invalid Construction Contract "Processed Effectively"

Posted on:2017-02-07Degree:MasterType:Thesis
Country:ChinaCandidate:Y ChenFull Text:PDF
GTID:2336330491962965Subject:Law
Abstract/Summary:PDF Full Text Request
With the booming development of domestic market economy and the surge of population, Construction industry is growing rapidly. Construction industry plays a significant role in socialist market economy and all the pillar industries in that it relates to the vast majority additional population's residence (residence is a crucial aspect of domestic livelihood projects including clothing, eating, living and walking). The competition of construction industry is inclined to be more fierce because of the emphasis of national policies and the giant necessities from the market. However, construction industry is exposed to an array of issues that appears to be in danger under the shining surface. Construction industry is characterized by giant capitals related, extensive object and the complexity which makes itself not be regulated effortlessly and legal regulations and judical interpretation related to it are defect. These factors result in that numerous issues and disputes could not be reached an agreement and settled. Thereinto, the issue on invalid construction contract processed effectively in existing legal regulation and judical practice is debated rather fiercely because the regulation and processing way not only get away from the concept of basic law and related regulation but also result in the chaos of instruction in judical practice. Hence the settlement of this issue is urgent, which is necessary for the resolution of internal contradiction in law and is inclined to be useful for directing the judical practice and regulating the construction industry.According to the exposition above, the dissertation is researching the issue on invalid construction contract 'processed effectively' and the structure of it is as follows:the first part is introduction. This part would lead to the value and urgent degree of researching and solution on the issue through narrate research background and sense. The second part and third part would arrange and expatiate basic theory of construction contract and related legislative circumstance of invalid construction contract 'processed effectively', which lays the solid theoretic foundation of the research of this issue as follow. The fourth part would examine the issue by examples in jurisprudence analysis and practice discussion founded on the first two parts. Finally the subsequent part would propose effective methods in order to be benefit for readers' reading.
Keywords/Search Tags:construction contract, invalid, processed effectively
PDF Full Text Request
Related items