Font Size: a A A

The Xilinji Hydrological Station Implemented An Analysis Of The Flow Measurement Program

Posted on:2017-05-11Degree:MasterType:Thesis
Country:ChinaCandidate:S H LiuFull Text:PDF
GTID:2350330512461812Subject:Hydraulic engineering
Abstract/Summary:PDF Full Text Request
At present,many domestic hydrological stations still use the traditional way of measuring often,Xilin Ji hydrological station is no exception,now Mohe County survey team test task is increasing,human resource can not meet the Mohe County investigation team needs,in order to liberate the existing hydrological station staff productivity,improve work efficiency,the rational allocation of regional hydrological monitoring of human and the resources and more efficient completion of the hydrological monitoring task test area,so it is urgent to find a new way to change the Xilin Jishui test station status,this paper selected resistant Kyrgyzstan hydrological station from 2005 to 2014 a total of 10 years of smooth flow analysis data series includes high water,water,low water different hydrological data,according to the "standard for hydrological research"(SL195-2015)requirements,through the use of hydrological relation statistical test,calculation method,statistics Such as MATLAB,Excel and other mathematical methods and computer software,Kyrgyzstan resistant hydrological station flow measuring error analysis,resulting in the ten year integrated stage discharge curve of the resistant Jishui station,finally Kyrgyzstan hydrological station flow resistant period can be measured from the previous way to stop using 2-5 dating for 1 years the test plan.
Keywords/Search Tags:Hydrologic station of the Xilinji, interest, Water level discharge, error analysis
PDF Full Text Request
Related items