| I combined with the current situation of power production and operation mode, the current situation of the system before the operation of substation and dispatching system is introduced. Pools of packets, we can draw a conclusion that the function; the focus of the paper research content and the main work in the business analysis, the research is mainly analysis system may exist doubts, the organization, the original business processes, analysis, summed up the most suitable for the business process. In the analysis, the paper use for reference the use case analysis and use case descriptions to determine the system function of the system’s overall function diagram and sub function package diagram, including the first piece of planning management; the second piece:the shift of administration; the 3 blocks:Industry and trade management; the fourth block; workpoint evaluation and statistics management. The five blocks:basic data management, the six blocks, system management sub package diagram. In data analysis, the every function of system of the need to deal with data were analyzed, given the entity relationship diagram established database table structure; finally experienced research and analysis in the paper to give a final analysis, and on the next phase of work for full of expectations. |