Font Size: a A A

Research And Analysis Of The Management System Of Rural Dilapidated Buildings In Zhongshan City

Posted on:2017-01-02Degree:MasterType:Thesis
Country:ChinaCandidate:W X WangFull Text:PDF
GTID:2358330512964114Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Along with the rural reconstruction projects faster and faster, more and more rural reconstruction project, the Zhongshan Municipal Bureau of housing management has not complied with the rural reconstruction project of Zhongshan city pace; at the same time, the traditional business management can not guarantee the information transparency and efficiency; and the rapid development of information technology based on in order to make the urban and rural areas of Zhongshan City Bureau of housing and work to keep up with the pace of information technology, we need an information system to assist the rural reconstruction project management.This thesis introduces the Zhongshan city rural reconstruction project management system research background and significance of the project, as well as the current status of research and application, clear the research direction, contents and main work; in business analysis, the analysis of business process definition, organization overview, business staff of rural reconstruction project in Zhongshan city the tube, the original business process are analyzed, the realization of information management process are given, determine the design direction of the software system; in functional analysis, the use case analysis and use case description, the Zhongshan city rural reconstruction project management system, the overall function of the system is given and the package diagram sub function diagram, including the basic data management, report management, public management, construction management, statistics management, subsidy Management, system management package diagram; in data analysis, the system functions required for processing and analyzing the data of the entity class diagram is given, the establishment of the database table structure; finally, summarizes the research and analysis of the work done, and the follow-up work is prospected.
Keywords/Search Tags:Reconstruction, project management, business process, data analysis
PDF Full Text Request
Related items