Font Size: a A A

A Study On Optimization Of Productivity Construction Project Audit Of Shengli Oil Field

Posted on:2016-05-23Degree:MasterType:Thesis
Country:ChinaCandidate:Z JiangFull Text:PDF
GTID:2359330563451537Subject:Industrial engineering
Abstract/Summary:PDF Full Text Request
Oil and gas resources play important roles in the development of social economy and oil field productivity construction project is an important way of getting oil and gas resources.As an important construction project in national economy,oil field productivity construction project usually takes large amount of invest capital,has long constructing cycle and contains multiple construction sections,which make the oil field productivity construction project audit work more difficult than the other project.The current audit work of oil field production construction project mainly focus on post audit,which doesn't satisfy the requirement of oil field production construction audit work because post audit doesn't work well in the process of project supervision and administration.In order to meet the new audit requirement,this paper make a study on optimization of productivity construction project audit following the case study of oil field production construction project and the problems analysis on the basis of life cycle theory of construction projects,internal audit theory,tracking audit theory.After that,this paper proposes several supporting measures for the structure of optimized project audit.
Keywords/Search Tags:Oil And Gas Production, Construction Project, Internal Audit, Audit Mode, Quality Improvement
PDF Full Text Request
Related items