In boiler thermal losses,the smoke exhaust is more obvious in high parameters of boiler,.the composite phase change heat exchanger technology,can effectively reduce the exhaust temperature,on the one hand,to protect the bag dust collector,on the other hand to save fuel consumption,reduce pollution emissions.Combining with the Inner Mongolia jing tai power generation co.,LTD.No.2 furnace flue gas waste heat recycling engineering plan.With progress of the project cost,personnel,quality,etc as the research object,analyze the project's technical feasibility and economic benefits.This paper first introduces the relevant theories of project management;Secondly through the present situation of implementation of this project,such as waste heat recovery boiler project overview,the application of composite phase change heat exchanger and boiler flue gas waste heat recovery technology;Third,analysis the feasibility of the project,mainly includes the energy saving potential analysis,organization and human resources configuration management,financial management and fire protection of health and environmental management;Finally,with the supply and the risk of the project management effect forecast analysis,we come up with the comprehensive evaluation and demonstration research,and puts forward safeguard measures and Suggestions for the project management. |