| Nowadays,among the three new energy sources,solar energy is the most renewable energy source in the new energy category,and the potential for development and utilization is large.The photovoltaic power generation system can be used only in places where there is light,regardless of the regional and altitude factors.It is favored by all countries in the world.The construction of distributed photovoltaics is one of the industries that the Chinese government encourages to develop vigorously.However,the construction of distributed photovoltaics faces serious difficulties.In addition to being subject to macroeconomic factors such as national policies and industrial systems,the financing problem has become a bottleneck restricting the development of new energy industries.For S Photovoltaic Company,in June 2017,S Photovoltaic Company built a distributed photovoltaic power plant with a total installed capacity of 20MW in Yangzhou Industrial Industrial Park,of which construction funds need about 160 million yuan.The project adopts after-sales in the financing lease mode.In the form of rentback,in order to help S-photovoltaic companies and A-finance leasing companies to have a clearer understanding of the versatility issues arising in the process of financing leasing,this paper is in the financial and non-financial case of S-company distributed photovoltaic project financing leasing.After the financial analysis and the analysis of the financing lease of S Company and the macro level,the corresponding improvement measures and suggestions are proposed.Firstly,through the literature research method and experience summarization method,the paper understands the advanced financing methods at home and abroad,sorts and summarizes them,compares and analyzes them,and determines the research starting point of this paper.Secondly,based on the determined research direction,the field research method is adopted.In-depth understanding of the current status of distributed photovoltaic financing of S company,provide sufficient factual basis for the research of this paper;again,using data analysis method,case analysis method,etc.to analyze the case of distributed photovoltaic project financing lage of S company and propose the macro level Industry recommendations and specific measures at the micro level.Based on the review of the financing lease case of distributed photovoltaic project of S company,this paper analyzes the problems existing in the financing lease of S company,including:the dependence on government subsidies and parent companies is large,the overall strength is insufficient,and the ability to resist risks needs to be improved;And the management structure is not standardized,the enterprise rules and regulations are not perfect;the project is hidden and the investment risk is high.As well as the financial leasing laws and regulations that exist at the macro level,the financial leasing supervision is disorderly and faces an unequal competitive environment;the government has insufficient support for financing leasing,and correspondingly proposes improvement measures and recommendations.First,we should enhance the competitiveness of enterprises;secondly,expand the financing channels through the Internet information platform-crowdfunding;finally,clarify the roof property rights and carefully select projects.In response to the macro proposal of S Company’s financial leasing,first of all,the legal system related to financial leasing should be formulated as soon as possible.Secondly,special regulatory agencies should be established to strengthen communication and gradually promote unified supervision.Finally,the government departments implement fiscal taxation and credit preferential policies.This paper aims to explain the existing problems of S company’s PV project financing lease,and point out the regularity of the distributed PV financing leasing process,and then guide the distributed PV industry in the market economy.Develop in a healthy,fast and continuous direction. |