Font Size: a A A

Research On Refractory Technical Renovation Project Quality Management Of Baosteel Stainless 1#Sleeve Kiln

Posted on:2019-11-01Degree:MasterType:Thesis
Country:ChinaCandidate:F P LiFull Text:PDF
GTID:2481306047470034Subject:Project management
Abstract/Summary:PDF Full Text Request
Project quality management is one of the most important contents of project management,it is straightly related to the success or failure of the project.Project quality management,improve the level of project management,maximize meet customer needs and expectations,and get the largest customer satisfaction,is to improve the enterprise market competition ability important guarantee.How to improve the project management level and apply appropriate project quality management tools and methods are the guarantee for the realization of project goals.Baosteel stainless steel 1#sleeve kiln has 14 years of continuous running,furnace refractories are different degree of fall off,craze,the phenomenon such as abrasion,erosion,has a furnace refractory material structure types of complex and refractory material,masonry control factors etc.,more bigger long-term adverse effect on the subsequent production,project quality has an important position in the project implementation;And many factors affect the quality of the project implementation process,therefore on baosteel stainless steel 1#sleeve kiln furnace refractories technology renovation project quality management research has important significance.In addition,the achievement of project quality objectives is one of the main factors that directly affects the quality of lime,and it is an important factor that directly affects the quality of Baosteel's stainless steel products.This article mainly from baosteel stainless steel 1#sleeve kiln furnace refractories technology renovation project quality management,the first to the quality of project planning,determine the control plan of project work,through the analysis of the project elements,such as shark fin figure method,analysis of the logical relationship of project activities and project quality assurance,to develop a feasible project quality plan.Secondly,on the basis of the quality control methods and tools to control the quality of project,the quality control of the project within the planned targets.
Keywords/Search Tags:quality management, quality plan, quality control, quality assurance
PDF Full Text Request
Related items