Work Breakdown Sructure In Alumina Engineering

Posted on:2009-06-08Degree:MasterType:Thesis
Country:ChinaCandidate:K X XuFull Text:PDF
GTID:2121360278464146Subject:Detection Technology and Automation
Abstract/Summary:PDF Full Text Request
Based on the internationally popular Earned Value Concept, Work Breakdown Structure is the Engineering Project Management. The project is the work plan platform reasonable based on the decomposition of. It is the progress of plans, projects of various types of data interpretation of floor plans, responsibilities matrix, cost estimates, risk analysis, project objectives and the basis of the coordination process. Through the application of WBS, able to optimize the scheduling of resources, implementation of cost estimates, project risk management, procurement plans guarantee the smooth implementation of effective control projects and significant changes to improve work efficiency.This thesis to the project management theory as a guide, reference works at home and abroad related to the field of project management experience in practice, alumina project in accordance with the characteristics of the project, in the light of the Guiyang Branch of the international aluminum alumina project management requirements, the application of project management in the decomposition of the WBS Rules, the alumina project management work Congtaidaoxiao layers decomposition and the code in the project area to conduct a comprehensive description, based on the establishment of a level and structure of clear, concise, coherent plan of the management platform.This thesis focus on alumina project WBS decomposition method and coding, alumina projects OBS decomposition method and coding, alumina engineering equipment and materials WBS coding standard classification of three parts, as well as parts of the system were discussed. Taking into account its scalability, its coding to coding based on the metric system, given its structure and systems of great significance. In addition, in order to facilitate project management and project management software called the use of the letters as a prefix to increase local, to enhance its readability. This form of coding for the use of project management software provides a base platform, significantly reducing the complexity of management.
Keywords/Search Tags:engineering project management, work breakdown structure, earned value concept
PDF Full Text Request
Related items