Font Size: a A A

Annual Production Of 2,000 Tons Of Meat Products

Posted on:2017-05-05Degree:MasterType:Thesis
Country:ChinaCandidate:L ShiFull Text:PDF
GTID:2131330485492833Subject:Agricultural extension
Abstract/Summary:PDF Full Text Request
The project design is an annual output of 2000 tons of Jerky. The whole plant design involves the following: Calculation of the prospects of the product market, raw material supply, site selection, production programs and classes yield, material balance calculation, equipment selection and calculation, workshop layout, labor, environmental protection and so on.The design of people-oriented, safety first, quality oriented design concept, the entire design in accordance with the process requirements. Factory plant area, as well as workshop layout and vertical layout to the actual operation of the product design requirements for the center, and around its logistics, flow, import and export requirements, storage requirements for careful arrangement. The plant layout and workshop layout can meet the production of the planned product, but also take care of the future development, not only meet the requirements of the process, but also to take care of the building design and construction feasibility. In equipment selection, as far as possible selection of machinery and equipment, for the process of Chinese meat products, unit operation and standardization of production to provide a good condition, and then make the production with high mechanical automation..
Keywords/Search Tags:Jerky, Material balance, Equipment production capacity calculation and selection
PDF Full Text Request
Related items