Font Size: a A A

Research And Implementation Of Dense Medium Coal Cleaning Method Based On The PLC Control System

Posted on:2016-04-04Degree:MasterType:Thesis
Country:ChinaCandidate:H JiangFull Text:PDF
GTID:2181330452471389Subject:Control Engineering
Abstract/Summary:PDF Full Text Request
In order to meet the industrial coal on the coal quality requirements.Densemedium coal preparation technology is popular with its characteristics of easyoperation and high efficiency.Coal preparation technology has developed rapidly inour country,and has independently developed a variety of new type high efficiencycoal preparation plant,which also develop quickly in coal preparation plant automationprogress and most coal preparation plant has achieved centralize control,whichincluding part of the coal preparation plant improve the monitoring and controlmanagement system,realizes the collection of the whole factory equipment runningstatus,display,fault recording,storage and to from various process parameters andworking condition of historical data,monitoring the storage level and tank liquidlevel.Quite a number of coal preparation uses industrial television to monitor theoperation of the equipment.This paper introduces the dense medium coal preparation process requirements asa variety of important process parameters based on coal preparation plant which candeal with the raw coal3million ton/year.The automatic control algorithm of densemedium coal preparation process.Parameters usually takes classic control method andeven manual control in our country which parameters of the control precision is notaccurate in practical application.When the industrial and mining environmentchange,the density,content of magnetic material and the plant changes in wavelinear.The mathematical model of the system is difficult to establish,so this paperadopts the fuzzy control method of heavy medium suspension density,designs thefuzzy controller,setting parameter by using PID controller according to the dynamicchanges between parameters,and obtain proper PID parameters,then set the densityvalue to adjust to the actual density.According to the coal preparation plant preparation process and controlrequirements, this paper analysis the overall framework of the control system,fully considering the advantage,production safety and operation flexibility,adopts the way ofCRT+PLC comb with two industrial computer and a PLC. The device has two operationmodes,in the centralized control mode,is divided into automatic and manual mode.Inhardware configuration, the lower machine uses CPU315-2DP PLC, realizes thefunction of data collection,change,control all electrical equipment by using STEP7program.The upper machine uses soft SIMATIC WinCC,realizes the remote driving incoal preparation plant,stop and emergency stop function by using coal preparation plantconfiguration screen,and conducts remote real-time monitoring,parameter setting,alarm,historical curve and other function of the whole system.The upper and the lowercomputer adopt industry Ethernet communication connection,adopts PROFIBUS-DPnetwork communication connection between PLC master-station and sub-station.Finallycompletes the whole control system to meet the coal preparation plant monitoring,management and other requirements.
Keywords/Search Tags:Heavy medium coal preparation, PLC, Centralized control, WinCC, Field bus
PDF Full Text Request
Related items