Font Size: a A A

The Planning And Control Of No.2BOF Overhaul Project Of Shougang No.3Steel Plant

Posted on:2010-11-13Degree:MasterType:Thesis
Country:ChinaCandidate:W HanFull Text:PDF
GTID:2181330467978998Subject:Project management
Abstract/Summary:PDF Full Text Request
Face the competition of globalization, how to improve the working efficiency, decline low cost, make use of the modern information technical means to improve device,is a pressing and reality problem which all the stateowned business enterprises will confront with.Management of equipment,especially the overhaul management of the equipment is a important content in the management of industrial business enterprise produces. The condition of the equipments directly influences the economic efficiency, safety produces and environmental protection of business enterprise, the progress plans and the progress controls of the overhaul is link in the center in the management of overhaul work. Currently, because of following to use a traditional management method in the overhaul management of business enterprise, lack in new theories, new method, which cause to overhaul progress plan run in a different way with the actual engineering and the waste of time and the overhaul resources,influence the realization of business enterprise efficiency target.This paper mainly discuss the planning and control of the No.2BOF in the project of Shougang No.3Steel Plant.First of all, according to the problem in the No.2BOF, the paper brings up the issues, and sorts out the research ideas, main contents and main research methods.then discusses the basic theory, main methods and basic elements of project management, and the overview of the No.2BOF in the project of Shougang No.3Steel Plant are also given.Based on the theory of project management, the project schedule of No.2BOF, its plan of quality, cost, safety and environmental protection plan are formulated, and feasible control measures was put forward so as to control the process and ensure the realization of the targets of the project and this will benefit similar projects.
Keywords/Search Tags:Overhaul of the equipment, Project management, Planning and Control
PDF Full Text Request
Related items