Font Size: a A A

Research On The Sufrace Gathering System Optimization In The XM Oilfield Of Jilin Oilfield

Posted on:2015-01-18Degree:MasterType:Thesis
Country:ChinaCandidate:H X LiFull Text:PDF
GTID:2251330428996351Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
XM oilfield was established in1990, is a production, grease, oil and gas processing andtransmission of an integrated production units, more than20years to reserve the richmanagement experience, has a mature management mode. In order to adapt to the fiercecompetition under the market economy situation, XM oil field has been focused onimproving its strength, and the basic way to improve the strength is in the oil, grease, oil andgas processing and transmission to improve yourself. In this paper, we study the key is XMoilfield surface gathering system optimization research.Based on the XM oilfield representative of an engineering project as an example,according to the current situation of the surface gathering system currently in the oil fieldand find the problem of original system management mode. Find problems through theanalysis of these problems, the causes, then further analyze the causes and influence factorsof relationship, can find out how to in the field of surface gathering and consumption methodand train of thought, targeted put forward the corresponding solution strategy.Energy saving work is an important work of growing potential in the oilfield at present,how to change in old oilfield adjustment process, through optimizing the ground engineeringconstruction plan, has low energy consumption, efficient operation of the surface gatheringsystem, has become a problem we discussed. The diversification of gathering system process,all kinds of new type pipe, the increasing of high-tech equipment, for our way in thegathering, gathering pipe, gathering on the selection of equipment, increase the variety ofviable option. So, this paper discusses all kinds of gathering and transferring mode andgathering pipe, new equipment, they have become the important link when we make plan, isthe key of the construction scheme optimization of ground, it can fundamentally change theway the production management, prolong the service life of pipeline, save production costand to the whole development of the late development, play a crucial role.Hope XM oilfield by using these results, strengthen management, continuousimprovement, to make project management to a new level, strengthen competition ability.
Keywords/Search Tags:Surface gathering, mixing process, Three tube with process, Saving energy andreducing consumption
PDF Full Text Request
Related items