Study On Schedule Management Of Surface Water Quality Automatic Monitoring Project In T City

Posted on:2018-03-10Degree:MasterType:Thesis
Country:ChinaCandidate:J HuangFull Text:PDF
GTID:2371330542475677Subject:Project management
Abstract/Summary:PDF Full Text Request
With the continuous improvement of the national water quality monitoring system,the opportunities of water quality automatic monitoring project which is built and operated by the third enterprises will be more and more in future,and the water quality automatic monitoring industry will usher in rapid development.Among the potential factors affecting the success of water quality automatic monitoring project,time is one of the important factor,which not only affects the project's total duration but also indirectly affects the project's scope,cost and quality,etc.Therefore,the study how to achieve overall objective under the condition of time constraint is important for project schedule management.This paper takes the example of surface water quality automatic monitoring project in T city,combined with project schedule management theory,as well as the domestic and foreign project schedule management status and trends analysis,using the analysis method of project schedule management,formulate the project schedule plan and project schedule control measures.Among them,the formulation of project schedule plan includes:project description?task decomposition?job responsibility allocation?the determination of the relationship between work tasks?task duration estimation?project schedule network diagram?critical route determination?project schedule optimization?make project schedule plan;The measures of project schedule control includes:project schedule control plan?measures to ensure the progress of the project?other problems and solutions in project schedule control.Based on the research of project schedule management,this paper has confirmed the potential factors affecting the success of surface water quality auto-monitoring project,found out the project's key path,put forward the schedule optimization and process adjustment plan to ensure the project on schedule,and also has developed a corresponding guarantee measures for project schedule control,which provides some reference significance for other water quality automatic monitoring projects in Build-Own-Operate(BOO)mode,not only helps to reduce the risk of construction delays,but also helps to find a better and more suitable solution for schedule optimization when carrying out similar projects in future.
Keywords/Search Tags:Project Schedule Management, Scheduled Plan, Schedule Control, Water Quality Monitoring
PDF Full Text Request
Related items