| In the process of the cabinet project customization development,it will spend very long time in cabinet design,production and installation,and the construction process is affected by the progress of the renovation of the mud.In the housing construction process,the wall changes,room size differences,different units,and even the same type of different kitchen cabinets design programs are not the same.So,it result in cabinet project contractors in the cabinet product pricing budget deviation is too large,product’s structure design,room measurement and Error during installation is frequent.Hardcover cabinets in the cabinet products can be fully completed by the tender of the overall construction plan to complete the development of the project is very difficult.Throughout learning the theory of risk management and literature review,this paper combines practice in the development of SL project cabinets and the development of various risks during the process.From the way of project risk management,we are buid up the SL company’s own management methods,product development and implementation methods in the cabinet customization project development,risk Analysis,evaluation and control framework.First of all,we divided SL company cabinet customization project into four development stages through the flow chart method,and find out and identification the sources and causes of the risks from respectively,multi-angle view.Secondly,the risk matrix method is used to analyze the risk factors and risk assessment of the risk factors identified in the four stages of the development in the SL project.The risk value(f)of each risk factor is calculated.The Borda sorting method is used to sort the multiple risk points of the process nodes in the customization project development process of the cabinet,thus more clearly quantifying the influence of the risk factors on the project.Finally,it puts forward the risk factors for the development and implementation of the project through the establishment of project communication mechanism,education and training,and process monitoring.The research value of this paper lies in the practice of customizing the project of the cabinets in several fine decoration commercial residential buildings and the use of project risk management to help the other cabinets in the industry to establish the risk management theory system developed by the customization project of the cabinet.Cabinet industry companies solve practical problems encountered in the process of customization of cabinets,reduce risk and reduce development costs. |