Font Size: a A A

Schedule Planning And Control Of CG Waste Glass Sorting Processing Base Expansion Project

Posted on:2016-02-16Degree:MasterType:Thesis
Country:ChinaCandidate:C LuFull Text:PDF
GTID:2381330572965808Subject:Project management
Abstract/Summary:PDF Full Text Request
Construction schedule control runs through the whole construction process of building engineering.The construction schedule will directly affect:the whole project construction period,the amount of work,the consumption of resources energy.Whether the project can be completed according to the plan or not means whether the whole project can be completed on schedule and delivery.It plays a direct and decisive role on the economic benefits and corporate reputation of the construction enterprise.So construction progress control and management of construction project is really important.This thesis is mainly about the project schedule plan and control.According to the actual situation of the project,I select CG waste glass sorting processing base expansion project as the research object to explore.Use the project management theory and methods,WBS principle and time estimation method,combined with CG waste glass sorting processing base expansion project implementation progress to elaborate the whole process of the development of CG waste glass sorting and processing base expansion project schedule.Use literature research method,design track and adjust system,and track the actual progress of the project to find out the factors that affect the progress of the project implementation.Then correct the progress deviation timely,adjust and control the affected subsequent processes scientifically.By improving the organization and system guarantee and reducing the uncertainties in the implementation of the project to ensure the parts of the project will end on schedule.They are good for improving the core competitiveness and the management level of enterprises.Finally,summarize and prospect the full text.I take part in the development of the project from the planning,optimization,tracking and adjustment to generate a new plan.I use the WBS decomposition structure,Gantt chart,critical path method etc.These methods are not only applicable to the project,but also provide an important reference for the project management in the later stage of the project.They also have important significance to other similar projects.
Keywords/Search Tags:Project management, Schedule, Schedule control
PDF Full Text Request
Related items