| Bright project is a mass public security prevention and control project" that takes county(district),township and village three-level comprehensive governance management platform under the jurisdiction of a city as the command and dispatch platform,takes information data as the back platform support,takes grid structure management as the foundation,and focuses on the collection of video and image application of supervisory and union equipment.Nanchang "liquid" in section D engineering construction,according to the city five years of planning and design construction requirements,closely around the "global coverage,the controllable" entire network sharing,full-time available,for the whole of the overall goal,the "government procurement,public bidding,the public security management,resource sharing" construction mode,insists on unified planning,unified construction,comprehensive application,the principle of overall management,pays special attention to the building,union,remittance,transfer,store,tubes,with "seven key construction content,in order to make with characteristic of Nanchang city " understand "project",completed with the economic and social development and the need of public security in public security video surveillance system.Based on the implementation of bright project in D district of Nanchang city,this paper analyzes and sorts out each link of the project implementation according to the specific operation process of the project.Based on the characteristics of the actual situation of the project,schedule management of combined use of project management,quality management and risk management theory,on the whole project tasks,schedule,and the conditions of the need to prepare the related project plan,the whole process of project construction ahead of schedule reasonably,and to the project construction quality control and risk control,put forward a reasonable and effective methods and strategies,eliminate the unfavorable factors existing in every link in advance as much as possible,make the project under the scientific planning,a complete project time schedule,quality goals and cost targets. |