The Research On New Methods Of The Planning Management Of Uncertainty Engineering Projects

Posted on:2003-02-18Degree:DoctorType:Dissertation
Country:ChinaCandidate:D X NiuFull Text:PDF
GTID:1116360062975632Subject:Technical Economics and Management
Abstract/Summary:PDF Full Text Request
The study of indefinite planning management accords with real fact furthermore than the old methods because it researches the complexity of the object and considers definitude of influential factor. Today, it is one of the front lines hi the field of tech-economics and management. It's also one of the difficulties. So it has theoretic value greatly and practical significance primly.The article emphasizes some new methods in the fields of project item planning management. They are as followed: the technique method of indefinite network planning and optimizing, the forecasting and optimality method of indefinite item and nonlinear time limit for a project and cost, the fuzzy cluster analysis hereditary algorithm of network resource equilibrium planning, the VANN forecast method of indefinite project item cost. At the same time, it also puts up some demonstrations.The primary innovations are followed:1 > it discusses the actuality and development of the technology of project items planning management summarily. It aims at the illogicality of defining "fuzzy mum or min" in the previous study of fuzzy network chart, and puts forward new definitions about "fuzzy mum or min ". Meanwhile, it sets up the definition and calculation of fuzzy time parameter based on it. And it gives the new definition of fuzzy key liner, advances fuzzy sub-key line and the new algorithm about the new fuzzy key line. All these are based on the new definition of "fuzzy mum or min ". By comparing the results of the living example, it analyzes the inconsequence of the old algorithm about the key line of the fiizzy network and verifies the rationality of the new method based on the new definition advanced. It offers a new means to calculate project time limit about indefinite item planning-management.2 > It put forward the defining of average valve network corresponding to fuzzy network and calculation methods of fuzzy-network's minimum cost program under the new fuzzy maximal (minimal) definition. It is a fresh optimized result corresponding its average value network. Besides, it lodges that, to reach the aim of optimizing compress, there needs to forecast the best total time for an entire project, bringing forward a request for study of chapter four. And it also presents an example calculation of optimizing minimum cost time limit for fuzzy network to explain this new method.3 > It sets up fuzzy interpolator for time limit for an item-total cost connection, which is effected by fuzzy influencing factor. By the way of sorting, it can weaken gray degree modeling historical data, increase whiten-grade, weaken disturbance, boost up rules, in favor of improvement of projection precision. A new method on cost-forecast and optimizing decision-making is built up, aiming at nonlinear problem of fire-electric power set capital construction time limit cost, based on gray system theory. It overcomes the disadvantages that orthodox analyzing method wants a great deal of stylebook to ensure probability distributing, big calculation, and ignoring fuzzy effective factor, and that different nonlinear total cost curves need to find different statistical forecasting model. By pulsing creation techniques, nonlinear total cost problem is unified to GM (1,1) model. And by introducing intervene gene, precision of gray forecast has much improved.4> According to the problem in solving network resource equilibrium plan we put up fuzzy cluster analysis technology and it overcomes the defect of common hereditary algorithm used to network resource equilibrium plan. With fuzzy cluster analysis technology, the community with better applicability can be inherited and it can keep the specificity of population distribution in the course of reproduction. By the classified method based on populationoptimality the range of discovery continue being contracted, it can accomplish self-compatible sequential optimum searching, so it can greatly improve the calculation's velocity, precision and searching optimality ability in all s...
Keywords/Search Tags:item management, indefiniteness, network planning technology, fuzzy network, cost forecast of time limit for a project, time limit for a project optimality, resource equilibrium, cost forecasting, fuzzy cluster, hereditary algorithm, gray forecasting
PDF Full Text Request
Related items