This article discusses the characteristics, development and utilization of water resource in Baotou Donghedong district. It has necessary and feasibility for the reclaimed water treatment and reuse in Baotou Donghe district. The technology flow and engineering design proposals have been supplied and approved upon the analyzing and surveying the situation of Baotou wastewater drainage, end user requirement for the water capacity and quality of the effluent and comparing and studying the documents of reclaimed water and reuse collected from domestic and abroad. The scientific analyses for the project investment, assessment and its environmental, economical and social benefit have been confirmed by comparing the feasibility study with the operating results after the project put into the operation. It demonstrated adequately the feasibility for the reclaimed water treatment and reuse project in Baotou Donghe district.
|