Font Size: a A A

The Study Of The Center Control Room Of Deep-water Semi-submersible Drilling Platform's Integrated Whole System

Posted on:2011-07-27Degree:MasterType:Thesis
Country:ChinaCandidate:S ZhangFull Text:PDF
GTID:2121360308490520Subject:Ships and marine structures, design of manufacturing
Abstract/Summary:PDF Full Text Request
The key issues of deep-water drilling are the equipments and technical support. Due to the restrictions of natural environment where it is carried on, it is necessary to equip highly integrated whole control system for the equipments of deep-water semi-submersible drilling platform in order to make deep-water drilling in high quality, speed and efficiency, as well as low cost and risk. Although deep-water drilling technology involves a wide range of equipments and techniques, we mainly concentrate on the study of the integrated whole system that associated with the drilling equipments of deep-water semi-submersible drilling platform in this paper. The main function of integrated whole control system is providing operation and real-time guidance for on-site deep-sea drilling work. As the major part of the whole system, drilling integrated contiol room is the main work space of drilling staff who conducted the deep-sea drilling. And the corresponding operating units of drilling integrated control room are the basic units that used to implement deep-sea drilling. In this paper, each part of the integrated whole control system is deeply analyzed and studied. Besides, another important part in this paper is the research on the safe and comfortable working environment in order to make sure that the equipments and environment in control room could fit for the human physiological and psychological characteristics, as well as the human capability and limits, which could help the integrated whole control system fully play its role. Based on the considerations of issues above, the plan about contiol room is developed accordingly in order to provide some exploratory work for the design and development of Chinese deep-water drilling equipment integrated control room.
Keywords/Search Tags:Deep-water drilling, semi-submersible drilling platform, integrated systems, drilling control room
PDF Full Text Request
Related items