| High layer building because layer number than much, the construction arrange the top and bottom variety not very, especially enter the standard layer the empress, construction construction craft repetition than much, and the high layer building is much for the high layer residence or write floor, development the company force in the reason of the funds cost and the request's work period purpose for specially tightly, contractor too come froming lowering the construction cost but as far as possible and quickly start construction degree of progress, reduce a kind of construction technique for of turnovering, but The liquid presses the glide formwork, an integral electric lifting scaffold start constructioning technique is concrete engineering with reinforced concrete engineering inside mechanizing the degree highly, start constructioning speed quickly, field ground take upping littlely, safe homework having guarantee, synthesizing the performance getting very bigly exaltation of template and outside.Therefore, these mechanize the higher consecution of degree the type's construction technique, got the extensive expansion with apply.In the high layer building under construction expansion the glide formwork using using technique contain" The liquid presses the glide formwork craft"," the slid-frame forword-mold craft"," the liquid to press to climb the mold craft".Construct the construction characteristics according to the high layer, and again developped" a the slip is on sprinkling the method" again call" an layer empty slip floor plank and enter the method the "," first slip wall floor the plank follow the method the "," first slip wall floor the plank decline the mold method" etc. construction technique.Recent, returned the research to develop the set's slip mold construction technique, such as" high layer building set slip mold construction big crest of card of technique"," pine slip mold construction set technique" etc., make the slip mold construction synthesize the technique applied level ascend a new step.The direct direction of the high layer building the construction primarily is a core reel , shear the dint the wall, frame the pillar,frame the beam is a construction quantity with the work period point for degree of progress controling, these pieces can adopt the slip mold the construction.The slip mold equips main be been lend support toed up by template, promote a template system for, rounding the turn to constitute, and be operated by lord terrace, namely by three greatest systems constitute, the platform mourn the feet hand the liquid for terrace system for constituting, from liquid pressing controling the set, oil the road with supporting pole constituting of to press to promote the system with inside outside.The design that slip mold equip primarily aim ats above three greatest systemses to proceeds the designs.The point that The liquid presses the glide formwork start construction is the buildup of the choice, personnel to hold tight construction project training, slip the mold equip to assemble and tore down, the control and corrective of the level and perpendicular degree deflection , level floor the plank cross a technique control for of handling, and safe quantity.In the building under construction, feet hand use to have great capacity, usage time long, the expenses is high, request safety, apply, economy .Along with the diversification of the building form, urge a toward pack the dismantle simple, move convenience, loading function good, usage safe and dependable direction development.In the corpus that high layer is with the the building of super-high layer is under construction, and the whole electricity move to climb to rise the feet hand the one of the 10 new techniques for high layer for superior for having obviously, it using the stuff littlely, only peaceful dismantle a time, climbing rising the fast convenience, economic performance large raising , is first kind very having expanding the use value building of outside feet hand, drive developments department be included inning the... |