Font Size: a A A

A Study Thesis About The Design Method Of 3-Lane Carriageway Highway Tunnel

Posted on:2007-08-28Degree:MasterType:Thesis
Country:ChinaCandidate:W ChenFull Text:PDF
GTID:2132360212458941Subject:Traffic and Transportation Engineering
Abstract/Summary:PDF Full Text Request
Three Lane Carriageway Highway Tunnel is the new tunnel structure that appeared just in the last few years. The design and constructions is placed in the quest stage currently. No very mature experience can draw lessons from. Currently NATM is adopted widely in the tunnel design, but the principle of NATM has no united standard at home and abroad yet. The three design methods: engineering analogy method, the theoretical calculation method and measure control on-site method. On the scene, three kinds of methods are applical and limit:1 Engineering analogy methodEngineering analogy method develops early. It assures the parameter and construction method on the base of the surrounding rocks classification and contrasts similar engineering experience. Therefore, engineering analogy method depands on the engineering practice experience .In addition, it is involved in the various factor of geology and engineering. So it is very difficult to the strict compare .2 The theoretical calculation methodThe theoretical calculation method is the method that according to analogy assure the support parameter at measure the surrounding rocks under the condition of the rock mechanics characteristic establishment mechanics model. The theoretical calculation method usually contain the theories resolution method,the numerical method and the pole department analysis method etc. FEM can in every digging stage acquire the dint, stability that moves and surrouding rocks etc and give the information of the actual design and construction stage. But it can't make sure the value of surrouding rocks physics mechanics accurately. So the theoretical calculation method can just analyse construction process in quality.3 Measure control on-site methodMeasure control on-site method recently developping a kind of with the spot the measurement is for the means, with the measurement information for design according to certain protects the parameter and pays to protect actual and start construction method of design method, also is usually the information feedback correction design say. It carries on various measurement simultaneously, the part arrives the result feedback of the measurement to design under construction, the...
Keywords/Search Tags:Three Lane Carriageway Highway Tunnel, Engineering analogy method, The theoretical calculation method Measure control on-site method
PDF Full Text Request
Related items