| Building industry is that important national economy matter produces the branch , its and development of the entire country , the people life improvement has close relation. Enterprise control level and engineering level are not high, application being short of modern project office procedure, do not achieve moreover construction project entire process administration, the profit having led to the building project to meticulous administration thought and inefficient, such necessity of project carry out insists to hang down. The thesis studies how the project passes the profit managing to the project meticulous and coming improve modern project office procedure applying a construction project's by research instruction for Cheng Dou City Sichuan-Tibet highway martial art marquis Duan reorganization and expansion project engineering construction mainly. The insufficient management of the enterprise must cause the low profit of the industry project. This thesis focus on improving the profit of the project by applying the meticulous and modern management through the studies of Cheng Dou City Sichuan-Tibet highway WuHouDuan reorganization and expansion project.the enterprise's profit of the project has been ascentained already in the process of tenderring. In order to get more profit ,the enterprise must cut the cost down by enhancing the progress planning and controlling of the project. this thesis, combined with the Cheng Dou City Sichuan-Tibet highway WuHouDuan, focuses on how to project and control the progress by the mordera engineering management .The content that the thesis relates to is included: Background and significance studying submitting the main body of a book first; Have analysed project general situation and significance secondly, and what framework of organization form to have adopted the administration coming to accomplish the in the homeland construction project according to concrete construction project reality; The project being in progress to the project describes , the project breaks up , the job describes , ascertaining that responsibility assigns , ascertaining that successively concerning , on-time the queens who work such as estimating , drawing the network picture , the rate of progress working out out a project working working plan the office procedure wielding the modern construction project then; In the process how in the process of construction project operation to be in progress in the project the day afer tomorrow, must monitor the project rate of progress to ensure that every item job can be in progress according to rate of progress plan unceasingly. And at the same time, must control unceasingly charging a plan's putting status into practice, the contrast reality and the plan is carried out analyses, should adopt the effective countermeasure when necessary, make a project be in progress according to predetermined rate of progress target, be procrastinated avoiding a time limit for a project. Be the thesis conclusion part finally. |