| Foundation works as an independent division works projects in the high-rise building units occupy an increasingly important position, and the foundation works structural safety, construction quality, the progress of the project and the impact on the surrounding environment, the foundation project cost and other factors have affected the basis of the design and foundation forms of choice, a choice of how to meet the functional requirements of both reasonable and the economy, at the same time, satisfy the constraints of a foundation program worthy of our study. Beverly Deyang City property with "Beverly others," the residential, commercial projects, according to geological conditions at the scene, in the alternative program foundation, through the bearing capacity of checking and construction technology, technical index analysis, cost costs Geometric selected job, and ultimately selected "High Pressure Jet Pile Composite Foundation +-independent basis "for the foundation works program. Such programs Deyang region for the first time in the implementation. After the implementation of the program, and works by detecting observation and all targets were met design requirements, results were very good.The results of this study indicate that high-pressure rotary spray pile composite foundation +-independent foundation is technically feasible and economically reasonable, safe and reliable construction, in Deyang in small high-rise building may be an ideal foundation program. The results show that: High Pressure Jet pile composite foundation +-independent foundation is technically feasible and economically reasonable, safe and reliable construction. After the implementation of the program, and works by detecting observation and all targets were met design requirements. |