Font Size: a A A

The Short-Term Load Forecasting Algorithm Research In Shi Zui Shan Area

Posted on:2009-12-27Degree:MasterType:Thesis
Country:ChinaCandidate:C N HeFull Text:PDF
GTID:2132360272974008Subject:Electrical engineering
Abstract/Summary:PDF Full Text Request
Short-term load forecasting as a basic arithmetic is essential to the operation of Power System. The result of short-term Load forecasting is the foundation that the Power System arranges generation plan or estimates standby capacity base on. The results accurately or not have significance to the safe and economic operation of the grid. Therefore how to improve the accuracy of short-term load forecasting has been a importance problem that people committed to research.Currently, there have many literatures about short-term load forecasting domestic and foreign. But because many complex factors affect the load and load uncertainty, making short-term load forecasting has not been a very satisfactory solution. At first, this paper expounds on the concept and meaning of the short-term load forecasting. Then this paper introduces the current status of research on the short-term load forecasting briefly, and generalizes the existing types of load forecasting methods.Secondly, in this paper the electricity load characteristics about district power grid of shi zui shan are analyzed and discussed deeply. For a specific power grid, some predictable factors that affect electricity load's change are researched. This paper also explores detailedly the specific relations between the various factors and load characteristics.Then, the manual neural network theory is discussed briefly in this paper. At the same time, the paper analyses the two forward-type networks detailedly and also ascertains their differences.On the basis of an in-depth analysis about the shi zui shan load characteristics and neural network, a Cascade Neural Network (CNN) load forecasting model based on BP Network and RBF Network is put forward in this paper. In this method the influences of measurable factors and past load on load forecasting are separately considered by two sub-networks. In the process of the model realizing, all kinds of input variables and the correlative factors are dealed with in a reasonable and quantify treatment. Finally this model is applied to the shi zui shan normal day load forecasting. The final results of the applicable example show that the forecasting results' precision of the Cascade Neural Network load forecasting model is more satisfactory. That is to say that the forecasting model or the forecasting method has a practical value.At last, the Gray System Theory is discussed briefly in this paper. A Grey Model based on Gray System Theory is put forward in this paper. Finally this model is applied to shi zui shan normal week load forecasting. The final results of the applicable example show that the forecasting results' precision of the Gray model is more satisfactory. That is to say that the forecasting model or the forecasting method has a practical value.
Keywords/Search Tags:Short-time load forecasting, Artificial Neural Network, Cascade Neural Network Model, Grey Model
PDF Full Text Request
Related items