Based on the highway project of Ningbo Xiangshan Harbour and the Houhua mountain specific situation of tunnel scheme, assumed the most common tunnel construction method in highway project i.e. blasting method,shield method,immersed tube method as subject investigated, the article studies the three tunnel construction menthod conformability on Xiangshan Harbour tunnel emphasis on technic direction.
|