Font Size: a A A

Study On The Chuan-Kang Construction Inspection Group Of The National Political Council

Posted on:2010-12-27Degree:MasterType:Thesis
Country:ChinaCandidate:C Y LiuFull Text:PDF
GTID:2155360272999029Subject:History
Abstract/Summary:PDF Full Text Request
Chuan-Kang Construction Inspection Group, an important institute of the National Political Council. The Chuan-Kang Construction Inspection Group came into existence from Chuan-Kang construct preparatory meeting after national suffrage assembly 1th committee convened third plenary session. After surveying Chuan-Kang area(Sichuan and Xikang province), the inspection group drafted out the report of Chuan-Kang Construction Inspection Group after national suffrage assembly, providing important source materials for constructing the backward Chuan-Kang area. A case study of it can further reveal its real situation during the Anti-Japanese War and deepen our understanding of the Nation- al Political Council.1. Introduction(1)The purportChuan-Kang Construction Inspection Group is an important institute of the National Political Council. A case study of it can further reveal its real situation during the Anti-Japanese War and deepen our understanding of the Nation- al Political Council.(2)Research actuality and problemA series of production have been acquired on the research of the National Political Council. But there are many weaknesses on the research of Chuan-Kang Construction Inspection Group. We will hammer at the instauration, status, production of Chuan-Kang Construction Inspection Group.(3)Historical materials and methodThe study will use literature materials, newspapers, periodicals, monograph and discourse. Research methods include logic arrange, induction and grand review.2. The establish of Chuan-Kang Construction Inspection Group(1)The society during the earlier Anti-Japanese War As the rear area of Anti-Japanese War, the tactic station of Chuan-Kang area increasingly apparent. Chuan-Kang Construction became instantly important.(2)The history and actuality of Chuan-Kang area Chuan-Kang area have expansion zone and abundance resource, but underdevelopment agriculture and Stockbreeding restrict it's develop. Improve the laggard economy in order to support war was very essential.(3) The establish of Chuan-Kang Construction Inspection Group Chuan-Kang Construction Inspection Group established in 1939-2-17.The Chuan-Kang Construction Inspection Group came into existence after national suffrage assembly 1th committee convened third plenary session. Than Chuan-Kang Construction Inspection Group established it's organize and personnel composing.2. Work summarize of Chuan-Kang Construction Inspection Group(1)Work arrangeBefore they leave, Chuan-Kang Construction Inspection Group set down The Work arrange, include inspection area, inspection content and inspection method.(2)General situation of inspection workChuan-Kang Construction Inspection Group were divided into five parts, surround official control, military service, the people's livelihood and economy construct.3. Feasibility analysis of Chuan-Kang Construction scheme(1) The content of Chuan-Kang Construction schemeChuan-Kang Construction scheme was based on the problems founded in the inspection course, content include nine part ,official control, military service, the people's livelihood ,economy construct, education and justice etc.(2) Feasibility analysis of Chuan-Kang Construction schemeChuan-Kang Construction scheme was based on the trimester review. Its content is accord with factual. Its shortage is the absent of material enforce institution. Its impersonality is sufficiency. the government and social has attach importance to it.4. The status with how Chuan-Kang Construction scheme put in force(1) All circles has attach importance to the inspection production All circles has attach importance to the effort of Chuan-Kang Construction Inspection Group, Profundity understand about the sense of Chuan-Kang Construction had been aroused. More and more people call on the support of Chuan-Kang Construction scheme.(2)Government's attitude and measureChuan-Kang Construction scheme received the government's support. Government choose Chuan-Kang construct preparatory meeting as its push institution. Chuan-Kang construct preparatory meeting reflect the status with how Chuan-Kang Construction scheme put in force to Jieshi Jiang , prolocutor dismiss or punish the illegitimacy placeman.(3) The status with how Chuan-Kang Construction scheme put in forceThere were lots of difficulties with how Chuan-Kang Construction scheme put in force. Especially the confirmed habit had been deep in the social. In fact, mostly Chuan-Kang Construction scheme were not come true.In a word, last a period of trimester review, Chuan-Kang Construction Inspection Group put forward many valuable advises for Chuan-Kang Construction. Although most Chuan-Kang Construction scheme not come true, Chuan-Kang Construction Inspection Group built up the countrymen's belief of Anti-Japanese War at that time.
Keywords/Search Tags:the National Political Council, the Chuan-Kang Construction Inspection, The establish, Work summarize, Chuan-Kang Construction scheme
PDF Full Text Request
Related items