Font Size: a A A

A Study On The Capital Construction Management In Institutions Of Higher Learning

Posted on:2005-08-21Degree:MasterType:Thesis
Country:ChinaCandidate:Y GaoFull Text:PDF
GTID:2167360122488499Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
The rapid development of higher education brings unprecedented favorable circumstances for the capital construction in institutions of higher learning. Under such circumstances, the reform of economic system and the particularity of the construction products in institutions of higher learning inspire some new reflections on the management of the capital construction. Among them, how to administrate the whole construction process of a project by means of economic and legal measures is a topic, which is widely paid close attention to by the administrative personnel in institutions of higher learning.With three main phases of the capital construction in institutions of higher learning as its breakthrough point, this study focuses on the management of public bidding issues, the management of project quality and investment in construction, the management of contracts and the discussion of project risks. These are not only the emphases and difficult points in the capital construction in institutions of higher learning but also highly-disputed hot issues in the architecture market at present.The paper consists of five chapters. Chapter one argues for the importance of the capital construction in terms of economic development and analyzes the features of the capital construction in institutions of higher learning. Chapter two focuses on the construction bidding issues. Chapter three and Chapter four discuss the managements of construction quality, construction investment and construction contracts respectively. Chapter five, in view of the existing problems in the capital construction management in institutions of higher learning, puts forward the appropriate measures to solve them.Based on laws and regulations in project construction, the theory of modern management science, the researcher's personal practical experiences in project management, this paper analyzes statistically the construction process quality, then takes some measures to rectify a deviation, and finally achieves the aim of controlling the quality in advance. As to the management of investment, it gets to decide on the best plan (including the design plan and the construction plan) by applying the principle of operational research to forming mathematic patterns and then analyzing them multi-dimensionally. In addition, this paper elaborates the systematized management measures in the valuation of the construction amount in detailed lists, the assessment of lowest-price bidder and the earnest money guarantees of a project, so as to maximize the economic returns.
Keywords/Search Tags:institutions of higher learning, the capital construction the bidding issues, quality, investment
PDF Full Text Request
Related items