| The article bases on the design and development of the Yunnan huaneng LanCangriver hydropower project management system, brings forward a set of cost controlsolution which is suitable for hydropower project construction application in Chinaaccording to the research of project management, theory and comprehension of theprinciple, flow and method of the project control. In the paper, it details the plan'sthree-hierarchy operation flow. They are: data collection, operation management,decision and put into practice by contract and budget management with Earned ValueMethod. It makes the management scope of traditional ERP extend from production termto basal construction term.Furthermore, it brings forward a three-dimension model which matches theintegrative control model including cost control, finance analysis and net schedulecontrol. And it validated the model's feasibility and rationality when Yunnan huanengLanCang river hydropower project management system was applying. |