Font Size: a A A

Study On Quality Control Of Phenol Acetone Plant Oxidation Tail Gas Treatment Project

Posted on:2015-08-30Degree:MasterType:Thesis
Country:ChinaCandidate:X L JiangFull Text:PDF
GTID:2181330467452044Subject:Business Administration
Abstract/Summary:PDF Full Text Request
With the continuous development of our economy and society, the number ofprojects under construction significantly increased. China government state theproject construction as an important power to promote sustainable economicdevelopment, and puts forward the construction project "determine project faster,choose bigger project, choose good project, do successful project”. Strategy, thisrequires project managers must try to enough attention to project qualitymanagement, strictly control project quality, make the whole process of projects andeach process in a controlled state, guarantee the smooth realization of the projectquality objectives, effectively promote the development of economy and society.Phenol acetone plant tail gas treatment project belongs to the chemical industryproject construction. Construction projects in the field of chemical industry shouldstrengthen the quality management and quality control work, this is because thechemical enterprise production process there are a lot of dangers, only guarantee forthe construction of the project in accordance with design specifications, the project’sconstruction process under strict quality control, ensure that quality objectives areimplemented smoothly, to ensure the safety of the built in various chemicalproduction facilities, stable and efficient work, production can run more stable, caneffectively avoid the happening of accidents and reduce losses of life and property.In this paper, based on the project quality management theory, combined withthe actual situation of specific enterprise and project, studied the present situationand problems of the project quality control, and specific improvement measures areput forward.At first, this paper expounds the importance of quality control in constructionprojects, and then from the ability and quality of personnel, system construction,organization system, the respect such as quality management measures analysis of specific projects in project quality management of the status quo, and then analyzesthe existing problems of the project quality control, and analyzes the cause of theproblem. Finally, the paper improve the management ability, improve the system ofproject quality control related, strengthen the construction site of the qualityassurance and quality measures, formulate scientific and rational completionacceptance standard and so on several aspects put forward concrete measures toimprove quality control.In this paper, combined with the actual situation of project, and puts forwardspecific Suggestions on project quality control, these Suggestions can not onlyeffectively solve the practical problems in project construction, ensure the success ofthe project, can also provide the similar project construction has the practicalsignificance of reference.
Keywords/Search Tags:Quality control, Phenol acetone device, Oxidation tail gas treatment project, Quality management
PDF Full Text Request
Related items