Font Size: a A A

On The Application Of Primavera 6 (P6) In Constructional Engineering

Posted on:2011-02-15Degree:MasterType:Thesis
Country:ChinaCandidate:Y SunFull Text:PDF
GTID:2189330332471328Subject:Project management
Abstract/Summary:PDF Full Text Request
the technique of project management, which is coming after the promotion of personal computer and speed of operation, becomes more and more prosperity. Project management software is widespread used in the electric power construction management gradually. Its clear way of expression is more convenience, lexible and efficiency in the time management. After imputing exercising tabulate, cetimated time limit for a project, logical relationships among each action, human resources and cost in it, it can also solve the problem of schedule'intersecting and point out the schedule chart. Besides, it has stronger capability of excuting records of item following the task of item's program and the note of actual situation of accomplishment. At the same time, it can show you the affection analysis in both actual and potential. Going a step further on enhancing the using of technology of network plan in schedule management, finding some management software which is suitable for our present conditions, establishing some relevant basic of the theory, it has important practical significance.This paper analysize and the plan the using of item management software in electric power construction's program management in the way of integrating the standard study and case analysis. At first, it finds out the gap between aboard and our nation in the using of software in the management of item's schedule by making a summary of the developing of software using in item schedule's management and main software'characteristics aboard and in our country. Secondly, taking the applying of P6 as an example, aimed to design the schedule management system of electric power construction's plan and expand working out and controlling of schedule plan in electric power construction. Thirdly, let item management software become a necessary tool for all the managers who are in the project construction, by using sharing function of LAP. At last, the paper put forward project information code which is suitable for electric power construction. For the sake of ensuring the moving of item software management organization, lay down relevant insurance rules in order to standard and bind the all manager's action.
Keywords/Search Tags:project Managements software, constructional engineering, P6(Primavera 6.0)
PDF Full Text Request
Related items