Font Size: a A A

The Research Of Optimism For Power Station Engineering Project Management

Posted on:2007-08-09Degree:MasterType:Thesis
Country:ChinaCandidate:N ChengFull Text:PDF
GTID:2189360185966357Subject:Business Administration
Abstract/Summary:PDF Full Text Request
The character of power industry is centralization of fund and technology. The power station project has such character as long period for construction, completion with production, provision, and sale simultaneously, unavailable storage and regional power supply. So it is needed to think for future, regulate with scientificity, design with rationality, and manage entirely construction for the construction of power station. At the same time it is needed to strengthen management and execute the bid law strictly for the completion with process, quality and security of the project.With the increasing of the power station project, there are more challenges and difficulties for the power station construct. The people are concerning very much about the means by which the working efficiency and quality will be elevated and the project can be commissioned in time and satisfied to quality balancing the costs and profits .So the power station project is selected to research for the thesis, the writer analyses and researches the project by the general principles and means of project management in order to find how to optimize the aim of duration, quality and cost for the project. The content of thesis includes the discussion of optimum method of "the limited recourse---the shortest duration", the introduction of resource schedule method in which the shortest duration can be got. The writer also show the analyses of relation between quality cost and benefit, and give out the optimum cost by the functional curve between the quality cost and benefit.The optimization of duration, quality and cost for the power station project give the project manager the aims of management . According to the optimum aims, the writer suggest the measures and methods of management for the effective control of duration, quality and cost in order to guarantee the realization of optimum aims.
Keywords/Search Tags:power station project, resource, quality cost, optimize
PDF Full Text Request
Related items