Font Size: a A A

The Research On The Technical Risk Management Of Seismic Exploration Operation Of ShengLi Geophysical Company

Posted on:2007-09-14Degree:MasterType:Thesis
Country:ChinaCandidate:F B WangFull Text:PDF
GTID:2189360212457868Subject:Business Administration
Abstract/Summary:PDF Full Text Request
The seismic exploration is one most universal technical method of the present petroleum (natural gas) in the exploration operation, unceasingly deepens along with our country petroleum exploration degree, it is more and more high to the seismic exploration technology request. This article main goal is: In view of the seismic exploration basic principle and the exploration item construction characteristic and the management complexity, introduced technology risk concept, and conducts the research to in the seismic exploration construction technical risk; Lists conforms to in the seismic exploration item concrete construction process risk recognition, the risk appraisal, the risk control concrete method; And aimed at the large-scale exploration item conducts the preliminary research to the technical risk early warning.The technical risk is one kind of risk under current technical development degree in the current seismic exploration construction faces in many risks, but also does not have one even better method to substitute the seismic exploration, in view of the seismic exploration construction process in technical risk, how to its appraisal, the forecast, the appraisal as well as how carries on the greatest degree to it dodge, should cause the administrative personnel and technical personnel's value. This article first introduced the seismic exploration construction principle, the method and the characteristic, simply introduced in the seismic exploration construction technical risk characteristic, the recognition method and the tool, introduction technology risk concept, applied the technical risk concept in the seismic exploration construction. This article research with emphasis mainly is in the seismic exploration construction the technical risk factor carries on the analysis; And from qualitative and the quota aspect to the technical risk appraisal, the superintendent may makes the decisive decision through qualitative and the quantitative evaluation to the technical risk. After studied the technical risk in anticipation, in the matter and the matter controls the method.
Keywords/Search Tags:seismic exploration, technical risk, risk assessment, risk response
PDF Full Text Request
Related items