Font Size: a A A

Study On The Risk And Countermeasures Of Agent Construction Management Enterprises

Posted on:2007-07-21Degree:MasterType:Thesis
Country:ChinaCandidate:F Z HuangFull Text:PDF
GTID:2189360212968594Subject:Land Resource Management
Abstract/Summary:PDF Full Text Request
How to improve the management skill of project, increase the benefit of construction, accelerate the internationalized process of the project management, it is an important problem that our country needs solving at present. It is a very good try to use the method of agency construction management, it is still at the starting stage in our country to use agency construction management at present, a lot of questions exist. Under agency construction management, the organization of the project implements is asking the specialized agent's construction unit of project management company to exercise owner's right, responsible for the work about the earlier stage of project construction and implementation stage.This text, analyzing around risks existing in the earlier stage and implementing stage of agency construction management enterprises, in the case of increasing project benefit, put forward the measure against the risk of agency construction management enterprises. Among them, during the course of agency construction management project bid, put forward through rigorous bid policy, reasonable encouragement to agency construction management contract and guarantor of contract , to take precautions against the risk of the agency construction management enterprises agency construction management enterprises; During the course of preparing in earlier stage of the project, under the guidance based on information flow and comprehensive integrated method, utilize the analytic approach of the level to analyze, assess to the risk, making the detailed risk plan have been proposed. At project implementation stage, it proposed integrated risk management method that based on group's thought of the project, it namely the participator of agency construction management projects (owner, agency construction management enterprise, contractor, supplier, etc.) must have group's cooperation spirit, each side cooperates and finishes the project together actively. Though trailing of risk forms and use the synthesis method to set up quality, cost, progress of comprehensive integrated method system to control the risk of agency construction management enterprises and improve the project benefit, illustrate the high benefit that brings by this kind of method for examples. At the whole implementation stage of the project, it point out some potential problem that agency construction management enterprises should pay attention to, in order to reduce the unnecessary risk to agency construction management enterprises. The above research, this paper point...
Keywords/Search Tags:Agency Construction Management, Agency Construction Management Enterprise, Construction Management, Risk Management
PDF Full Text Request
Related items