Font Size: a A A

Study And Establish The System Of The Information Price Of Ready Mixed Concrete In NanChang

Posted on:2008-01-20Degree:MasterType:Thesis
Country:ChinaCandidate:H J WuFull Text:PDF
GTID:2189360242470308Subject:Structural engineering
Abstract/Summary:PDF Full Text Request
The information price of NanChang's Ready mixed concrete is an important data that the construction engineering station of nanchang manage the price of NanChang's Ready mixed concrete. It is important to develop the NanChang's Ready mixed concrete health and quickly. So it is an utmost urgency topic to research the information price of NanChang's Ready mixed concrete.This paper combines manufacturing costing and Activity—based Costing to allot the cost of Ready mixed concrete.and build up the model of the cost of Ready mixed concrete. And make certain the standard composing of Ready mixed concrete with the cooperation of research unit. Obtaining a great deal of the original data of the cost of Ready mixed concrete thought a great deal of investigation. Getting the average cost of Ready mixed concrete of current Nanchang through a data processing.The point of this paper is to establish the system of ascertainment the information price of NanChang's Ready mixed concrete. This paper sets up the function model system of ascertainment mainly including: material price and management, costing and management, making the price of information, standing database management etc. These model provide an idea of concurrent engineering of calculating. The customer can deal with the date by the method of system tacit approval or by oneself.This system adopts the Visual basic.net as develop tool. The database adopts the Microsoft Access database, carrying out the system function.
Keywords/Search Tags:Ready mixed concrete, The information price, Manufacturing costing, Activity—based Costing, Composing of Ready mixed concrete
PDF Full Text Request
Related items