Font Size: a A A

The Dongjiang Hydro-electric Machinery Plant Production Planning And Shop Scheduling Research

Posted on:2008-12-25Degree:MasterType:Thesis
Country:ChinaCandidate:C B YangFull Text:PDF
GTID:2189360242999321Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
Producing plan for corporation is gist of corporation producing management; It is plan as a whole for corporation producing task; stipulating product varieties quality and progress and so on index in producing plan time, is action creed for fulfilling producing target in plan time, is important gist for corporation workout other plan, is important tache for corporation increasing economies benefits. Producing plan management is one of important functions in corporation management. It has very import effect for effective organizing produce and management for corporation.Dongjiang Hydro-mechanism factory of Baju Hydropower construction(Group) is specialty corporation manufacturing hydroelectric metallic structure and embedded parts for turbine. In recent years, along with hydroelectric market exploiting, products from single hydroelectric metallic structure manufacturing develops to hydroelectric metallic structure and embedded parts for turbine manufacturing. Produce scope enlarge ceaseless, along with product varieties diversification and miscellaneous working procedure, But Dongjiang Hydro-mechanism factory continue to use foregone management methods in producing plan and attempering management, management difficulties increase ceaseless in material supply, resource collocating and equipment load, abuses for foregone management mode appears ceaseless.Text analyses thorough Dongjiang Hydro-mechanism factory producing plan and workshop attempering actuality and existent problem, finding the modern management methods fitting Dongjiang Hydro-mechanism factory producing characteristics. And analyses concretely the existent problem about Dongjiang Hydro-mechanism factory producing plan framing, framing of working procedures attempering, plan of material purchase, producing plan actualizing and attempering and product management, handle modern information management technology, bring forward material measures improve careless and imprecise, separating, slow producing plan and workshop attempering problems, it has profound realism meaning for upgrading the factory' s market competing capability.Aim at Dongjiang Hydro-mechanism factory contracts postponing, products delivery postponing problems as resource conflict and uncertainty factor negative influence, base on complication restricting condition producing plan and attempering problems theory, analyses all kinds of existent factor and influence, analyses reasons about producing problems, hereon base, educe cutting factor negative influence and resolving problem' s measures and methods, at the same time, finding resolving precept by determining the nature and quantitative analysis on resource conflict problem. Finally take Stay Cone manufacturing' s producing plan and attempering a example, using complication restricting condition producing plan and attempering problems theory improves its meshwork, solves effectively related problem.
Keywords/Search Tags:PRODUCTION PLANNING, ATTEMPERING, MRP, FACTOR RESTRICT, CPM
PDF Full Text Request
Related items